Watch the outage spread before it happens.
Processes, IT assets, suppliers, external providers, data and controls in one graph. Bring down any node: ResiPlan shows what stops at t+5 min, t+15 min, t+1 h and t+4 h, what it costs, and where your RTOs promise more than they can deliver.
- 7 capabilities in one module
- Cost priced by criticality
- Included in the Enterprise plans
- Time elapsed
- t+1 h
- Nodes hit
- 7 / 9
- Processes stopped
- 4
- Cumulative cost
- €37,500
Example scenario, computed with the simulator's scale: an hourly cost by criticality for each stopped process, accumulated over time.
Six layers. One graph.
Processes, IT assets, suppliers, external providers, data and controls: everything your business depends on, linked in one view instead of six registers that ignore each other.
- Trace any process back to the cloud region it runs on.
- The graph starts from what you have already entered: BIA, CMDB, suppliers, processes.
The cascade, minute by minute. In euros.
Pick a node, simulate its failure. ResiPlan spreads the outage over time and estimates the cost of every stopped process, using an hourly rate per criticality.
- An order of magnitude to discuss redundancy: the cost shown is an estimate, not an accounting figure.
- Every simulation is saved: you find it again for the next exercise or committee.
- t+15 min2 processes stopped
- t+1 h4 processes stopped
- t+4 h6 processes stopped
AI finds the dependencies you forgot.
ResiPlan reads your BIAs, your CMDB and your processes, and suggests the links missing from the graph. Every suggestion explains why, with a confidence score.
- Accept in one click, or ignore: nothing enters the graph without you.
Payroll is critical in the BIA and the payment platform is in the CMDB, but no link connects them in the graph.
The BIA lists the switchboard as a minimum resource. The carrier is in the CMDB but linked to no process.
Your 4 h RTO hides a 24 h one.
If payment collection promises 4 h but depends on an ERP that needs 24, its real RTO is 24 h. ResiPlan compares each process with what it depends on and flags these silent contradictions before an auditor, or an outage, does.
- Each contradiction names the link that sets the real RTO.
- ProcessPayment collectionRTO 4 h
- IT asset · slow linkERP (SaaS)RTO 24 h
- SupplierERP hosting providerSLA 8 h
Where one failure brings everything else down.
The heatmap crosses each node with the critical processes it would stop. Single points of failure rise to the top: you know where to invest in redundancy first.
- A priority ranking, ready for the investment decision.
| Node | P1 | P2 | P3 | P4 | P5 | P6 | P7 | P8 | Processes hit |
|---|---|---|---|---|---|---|---|---|---|
| 01Core router DC1 | 3 | 3 | 2 | 3 | 3 | 2 | 3 | 0 | 7 / 8 |
| 02Directory (AD) | 2 | 3 | 0 | 3 | 2 | 2 | 3 | 0 | 6 / 8 |
| 03Cloud region EU-West | 3 | 3 | 3 | 0 | 2 | 0 | 0 | 2 | 5 / 8 |
| 04ERP (SaaS) | 3 | 0 | 3 | 2 | 0 | 0 | 2 | 1 | 5 / 8 |
| 05Payroll provider | 0 | 0 | 0 | 0 | 0 | 3 | 2 | 0 | 2 / 8 |
| 06Carrier B fibre link | 0 | 2 | 0 | 0 | 0 | 0 | 0 | 0 | 1 / 8 |
Power, telecoms, cloud: the invisible, finally listed.
Eight ready-to-use categories (electricity, internet, voice, cloud region, postal, payment rails, water, transport) plus your own entries, each with its SLA and redundancy.
- One carrier, one region: the missing redundancy stands out.
- Electricity2 feeds, UPS
- Internet2 carriers
- Voice● 1 carrier only
- Cloud region● 1 region only
- PostalSLA D+1
- Payment rails2 acquirers
- WaterSLA 24 h
- Transport3 carriers
Your own entries, with SLA and redundancy tracked
One data map, two regulations.
Which process uses which data, where it is stored, in which region, and whether GDPR (Art. 30) or DORA (Art. 5) applies. One cross-reference serves both.
- Data hosted outside the EU shows at a glance.
| Process | Data | Storage | Region | GDPR | DORA |
|---|---|---|---|---|---|
| Payroll | Employee data | HRIS (SaaS) | EU-West | yes | no |
| Online payment | Cards (tokens) | Payment provider | EU | yes | yes |
| Customer service | Ticket history | CRM | Outside EU | yes | yes |
| Reporting | General ledger | ERP (SaaS) | EU-West | no | yes |
- GDPR · Art. 30
- DORA · Art. 5
- one cross-reference, two regulations
Bring down your first node.
The graph builds on what you have already entered: no need to map your whole IT estate before running a simulation.
- 01
Request your trial
14 days free. ResiPlan checks your company, then you receive your access.
- 02
Link your dependencies
Your processes and BIAs feed the graph, the 8 external categories are ready to use and AI suggests the missing links.
- 03
Bring down a node
Pick one, run the simulation, and watch the cascade and its cost unfold.
Simulate your cascade before the incident.
Free 14-day trial. The simulator, AI discovery and the SPOF heatmap run on your own dependencies.